Shoring in Construction: A Detailed Guide

Shoring is the temporary support of a structure, an excavation, or the ground so that work can proceed safely. It carries loads or resists soil and water pressure until the permanent structure can do the job on its own. Shoring protects workers, neighboring buildings, utilities, and the works themselves, and failures are among the most serious accidents on construction sites. This article covers the types, design, installation, monitoring, and removal of shoring.

Why Shoring Is Needed

  • Prevents collapse of excavation sides, especially in deep pits and trenches

  • Protects adjacent buildings, roads, and utilities from settlement and damage

  • Allows excavation on tight urban sites where sloping the sides is not possible

  • Supports existing structures during repair, alteration, or demolition

  • Carries wet concrete and construction loads until slabs and beams gain strength

  • Controls groundwater and soil movement when combined with dewatering

Categories of Shoring

Shoring falls into three broad categories based on what is being supported:

  1. Excavation shoring: supports the sides of trenches, basements, and pits

  2. Structural shoring: supports existing walls, floors, or buildings

  3. Formwork shoring (falsework): supports freshly cast concrete

1. Excavation Shoring

Trench shoring

Used for narrow, relatively shallow excavations such as pipelines and cable trenches.

  • Timber shoring: vertical or horizontal timber boards (poling boards) held apart by horizontal struts (cross braces). Common for shallow trenches in stable soil.

  • Hydraulic shoring: aluminum or steel hydraulic cylinders that push walers or plates against the trench walls. Quick to install and remove, and adjustable from outside the trench.

  • Trench boxes (shields): prefabricated steel or aluminum boxes lowered into the trench. They protect workers inside but do not support the soil itself, so the soil may still move behind them.

  • Pneumatic shoring: similar to hydraulic, using air pressure.

Deep excavation support systems

Used for basements, metro stations, and deep foundation pits.

Soldier piles and lagging
Steel H-piles or I-sections are driven or drilled in at regular spacing (typically 1.5 to 3 m). As excavation proceeds downward, timber or precast concrete lagging boards are placed between them. Economical and fast, but suited to ground with low groundwater, since it does not form a watertight wall.

Sheet piling
Interlocking steel (or sometimes vinyl or timber) sheets are driven or vibrated into the ground to form a continuous wall.

  • Forms a relatively watertight barrier, good for high groundwater

  • Can be extracted and reused

  • Driving vibration and noise can affect neighboring structures

Secant pile walls
Overlapping bored piles, with alternate piles reinforced, form a continuous, watertight wall. Suitable for urban sites where noise and vibration are restricted.

Contiguous pile walls
Bored piles placed side by side with small gaps. Less watertight than secant piles, and often combined with grouting or shotcrete between piles.

Diaphragm walls (slurry walls)
Deep trenches are excavated under bentonite or polymer slurry, reinforcement cages are lowered in, and concrete is placed from the bottom up. Very stiff and watertight, and often used as the permanent basement wall.

Soil nailing
Steel bars (nails) are drilled and grouted into the soil face at regular intervals, and shotcrete is applied to the face with wire mesh. The excavation proceeds in stages from top to bottom. Common for slopes and cuts where space behind the wall is available.

Cantilever and braced walls

  • Cantilever walls: embedded deep enough to resist soil pressure without support, used for shallow to moderate depths.

  • Braced walls: supported by horizontal struts across the excavation or by raking (inclined) props bearing on a base slab.

Ground anchors (tiebacks)
Steel tendons are drilled through the wall into stable soil or rock behind the excavation, grouted, and tensioned. They keep the excavation clear of internal struts, which helps machinery movement and construction of the permanent structure.

Walers and struts
Horizontal beams (walers) run along the wall and transfer load to cross struts spanning the excavation. Steel pipe or H-section struts are common, often with hydraulic preloading systems to control wall movement.

Top-down construction support
On deep basements, permanent floor slabs are cast progressively from the top as excavation proceeds below, using the slabs themselves as struts. This limits wall movement and speeds the program, though it needs careful planning of access and temporary columns.

2. Structural Shoring

Used to support existing structures during repair, alteration, or adjacent work.

Type

Description

Typical use

Raking (inclined) shores

Inclined props bearing against a wall and a base plate on the ground

Supporting unstable or damaged walls

Flying (horizontal) shores

Horizontal struts spanning between two parallel walls

When a building between two others is demolished or altered

Dead (vertical) shores

Vertical posts carrying floor and roof loads

When a wall or column is being removed or replaced

Needling

Horizontal beams (needles) passed through the wall and supported on props

Removing the lower part of a wall or inserting an opening

Underpinning

Deepening or widening existing foundations in stages

Adding basements, correcting settlement, nearby deep excavation

Underpinning methods include mass concrete pits, beam and base, mini-piles, and jet grouting. Work is carried out in alternating small sections so the building is never left without adequate support.

3. Formwork Shoring (Falsework and Propping)

Temporary supports hold formwork and wet concrete for slabs, beams, and bridge decks.

  • Props and telescopic steel props: adjustable vertical supports for slabs and beams

  • Scaffold-based systems: cuplock, ringlock, and frame systems for heavier loads and greater heights

  • Table forms and flying forms: large pre-assembled units lifted by crane from floor to floor

  • Reshoring and backpropping: when formwork is stripped, props are re-installed or retained below newly cast slabs, so that the load is shared among several floors until the concrete has gained enough strength

Falsework must be designed for the weight of wet concrete, reinforcement, formwork, workers, equipment, impact from placement, and wind or lateral loads.

Materials Used

  • Timber: inexpensive and easy to cut on site, used for shallow work and bracing, with limited reuse

  • Steel: strong, reusable, and the standard for deep excavations and heavy loads

  • Aluminum: light and used for hydraulic trench shoring

  • Reinforced concrete: for piles, diaphragm walls, and permanent walls

  • Shotcrete and grout: for facing and ground stabilization

Choosing a Shoring System

Factor

Considerations

Soil type

Clay, sand, gravel, rock, fill, and their strength and stability

Excavation depth and width

Deeper excavations need stronger, braced or anchored systems

Groundwater

High water requires watertight walls or dewatering

Adjacent structures

Sensitive neighbors require stiff, low-movement systems

Space and access

Limits on struts, anchors, or machinery

Duration

Temporary versus permanent use

Noise and vibration limits

Restrict driven piles in urban areas

Cost and schedule

Balance of material, labor, and speed

Local regulations

Safety codes and approvals

Design Considerations

Shoring is an engineered system, not guesswork. A qualified engineer designs it using soil data from the geotechnical report.

Loads to consider

  • Lateral earth pressure

  • Water pressure (hydrostatic)

  • Surcharge from adjacent buildings, roads, stockpiles, and cranes

  • Construction equipment and vehicle loads

  • Seismic and wind loads where relevant

  • Temperature effects on steel struts

  • Impact loads (for example from excavator buckets)

Checks carried out

  • Embedment depth (stability against toe kick-out)

  • Bending and shear in piles and walls

  • Strut and waler capacity and buckling

  • Anchor capacity and proof loading

  • Base heave and piping in soft clay or sand

  • Overall slope stability

  • Predicted wall deflection and ground settlement at adjacent structures

Design should also include a staged excavation and installation sequence, trigger levels for monitoring, and contingency measures.

Installation Sequence (Typical Deep Excavation)

  1. Site investigation and design with approved drawings and method statement

  2. Survey and utility check (underground services located and protected)

  3. Pre-condition survey of neighboring buildings, with photographs and crack records

  4. Install the wall: driving sheet piles, boring piles, or constructing a diaphragm wall

  5. Install dewatering if required, before excavating below the water table

  6. Excavate to the first support level (about 1 to 2 m below the top of the wall)

  7. Install the first level of waler and struts or anchors, and preload or tension as designed

  8. Excavate to the next level and repeat, never excavating far below the last support

  9. Reach formation level and cast the base slab promptly

  10. Build the permanent structure upward, and transfer loads from temporary struts to permanent slabs

  11. Remove struts or release anchors in reverse order, only when the permanent structure can carry the load

  12. Backfill and extract sheet piles or complete the final wall finish

Safety Practices

  • No work in unsupported excavations deeper than the limit set by local safety regulations (commonly around 1.2 to 1.5 m for trenches without protection)

  • Provide safe access and egress, such as ladders within a short distance of workers

  • Keep spoil heaps, vehicles, and materials well back from the excavation edge

  • Install edge protection and barriers

  • Inspect shoring daily and after rain, vibration, or loading changes

  • Provide dewatering and drainage to prevent water buildup behind and below the wall

  • Never remove struts or members without engineering approval

  • Use trained, competent supervisors and operators

  • Maintain emergency and rescue plans, including atmospheric testing in confined excavations

  • Check for overhead and buried utilities before installation

Monitoring

On large or sensitive projects, instruments track how the shoring and ground behave:

  • Inclinometers measure horizontal wall movement

  • Settlement markers and survey prisms track ground and building movement

  • Strain gauges and load cells on struts and anchors measure actual loads

  • Piezometers monitor groundwater levels

  • Crack gauges on adjacent buildings

  • Vibration monitors during driving or demolition

Results are compared against alert and alarm levels set in the design. If readings exceed the alert level, work is reviewed, and at alarm level work stops and additional support is installed.

Common Causes of Shoring Failure

  • Inadequate design or ignoring the actual soil conditions

  • Over-excavation below the support level before the next strut or anchor is installed

  • Poor installation, such as loose connections, wrong spacing, or missing preload

  • Water pressure and inadequate drainage

  • Surcharge loads placed too close to the edge

  • Removing supports too early or in the wrong order

  • Vibration or impact from machinery

  • Lack of monitoring or ignoring warning signs

  • Corrosion, damage, or deterioration of members over time

Removal of Shoring

  • Follow the approved sequence, usually from the bottom up for internal struts

  • Ensure the permanent structure (slabs, walls, columns) has gained adequate strength before the load is transferred

  • Release hydraulic or jacked supports gradually

  • Backfill and compact in layers as the shoring is removed

  • Extract sheet piles carefully, since pulling them out can disturb the soil and nearby structures

  • Inspect and record the condition of materials for reuse or disposal

Quick Comparison of Common Excavation Shoring Systems

System

Watertight

Typical depth

Vibration

Cost

Timber shoring

No

Shallow

Low

Low

Soldier pile and lagging

No

Medium to deep

Moderate

Low to moderate

Steel sheet piles

Mostly

Medium

High (if driven)

Moderate

Secant pile wall

Yes

Deep

Low

High

Contiguous pile wall

Partly

Deep

Low

Moderate to high

Diaphragm wall

Yes

Very deep

Low

High

Soil nailing

Depends on facing

Medium

Low

Moderate

Opportunities that await you!

Career opportunities