Piping Materials Engineering Course
Piping Materials Engineering Course
- Trainers Rating
- 4(63)
- Course type
- Instructor led live training
- Duration
- 30 hrs
- Start
- Nov 16, 2024 · 3:30 PM
- Language
- English
- Views
- 863
- 7-day money-back guarantee
- Session recordings included
Why enroll
Comprehensive Understanding: Participants will gain an in-depth knowledge of piping engineering, covering design principles, material specifications, and industry standards comprehensively.
Practical Skills: The course includes hands-on learning with real-world examples and case studies, enabling participants to apply theoretical knowledge to practical scenarios effectively.
Industry-Relevant Insights: Learn about the latest trends, technologies, and best practices in piping engineering, making participants valuable assets to their organizations.
Enhanced Problem-Solving Abilities: Develop advanced skills to diagnose and solve piping design and material specification issues, improving system efficiency and reliability.
Career Advancement: Enhance your professional profile with specialized knowledge and skills in piping engineering, opening up opportunities for career growth in engineering design and project management.
Course details
To equip participants with a comprehensive understanding of piping design, material specifications, and industry standards, enabling them to effectively design, analyze, and manage piping systems in various industrial applications.
This course covers essential aspects of piping engineering, including component identification, valve selection, wall thickness calculations, adherence to codes and standards, material specifications, special parts, and detailed procedures for jacketed piping, piping line lists, and the enquiry process. Gain practical knowledge and skills through a structured syllabus that bridges theoretical concepts with real-world applications.
Course suitable for
Is this course for you?
Perfect for
- You work in Oil & Gas Upstream or Pharmaceutical & Healthcare
- You're a Chemical & Process / Mechanical Engineering professional
- You prefer live, instructor-led training with Q&A
Before you enrol
- No prior experience needed for this course
- Live online sessions, 1 hour per day over 30 days — join on the scheduled dates
Key topics covered
Introduction and Piping Components
Overview of piping systems
Identification and functions of piping components
End connections: types and applications
Valves
Types of valves and their applications
Valve selection criteria
Installation and maintenance considerations
Internal Pressure Wall Thickness Calculation
Fundamentals of wall thickness calculation
ASME B31.3 code requirements
Practical examples and calculation techniques
Branch Calculation and External Pressure Wall Thickness Calculation
Branch reinforcement requirements
External pressure considerations
Calculation methods and examples
Codes & Standards and ASME B31.3
Overview of relevant codes and standards
Detailed study of ASME B31.3
Application of codes in piping design
Details of Few Common ASTM Standards
Introduction to ASTM standards
Common ASTM standards used in piping
Material properties and selection criteria
Piping Material Specification & Fluid List in Detail
Understanding piping material specifications (PMS)
Detailed fluid list and compatibility
Material selection for different process conditions
Special Parts
Overview of special piping components
Design and application of special parts
Installation and maintenance considerations
Jacketed Piping with Steam Trap in Detail
Design and application of jacketed piping
Steam trap selection and installation
Thermal insulation and efficiency considerations
Piping Line List and Piping MTO
Creating and maintaining a piping line list
Understanding piping material take-off (MTO)
Importance in project management and cost estimation
Explaining Enquiry and TBA Process
Enquiry process for piping components
Understanding the technical bid analysis (TBA) process
Best practices for ensuring accurate and efficient procurement
Training details
This is a live course that has a scheduled start date.
Live session
Started
Sat, Nov 16, 2024 Ended
3:30 PM UTC· your timezone
Duration
1 hour per day
30 days total
Opportunities that await you!
Career opportunities
Frequently asked questions
A: A feels heavy‑handed, but it's the only step anchored in document control. A line number implies continuity unless a spec break, size break, or class change is explicitly documented. The reducer location alone doesn't justify a silent change. B sounds practical and many projects run that way, but it relies on tribal knowledge rather than traceable approval. C borrows a real erosion argument, yet nothing in the GA proves that intent, and valve sizing logic can't override a missing spec break. D shifts the problem to operations, but the question is about IFC approval, not hydraulic optimization, and you're still left with conflicting controlled documents.
A: A looks slow but it prevents dead‑ends. If the material is wrong, the test is meaningless, and slope issues are easiest to fix before reinstatement. B is tempting under schedule pressure, yet a perfect hydro on the wrong alloy still fails acceptance. C saves scaffold time, but postponing material checks until after access removal is how mismatches survive to startup. D reflects how flushing teams think, but slope is a construction attribute; once fluids are introduced, correction becomes intrusive and risky.
A: A aligns with how the standard is structured: cracking risk ties back to H2S partial pressure and material hardness. B sounds safe, and many specs are written that way, but it's a project overlay, not the base logic of the standard. C mixes two corrosion mechanisms; CO2 affects general corrosion, not SSC susceptibility in the way implied. D feels familiar from some company specs, yet ISO 15156 doesn't set a blanket pressure cutoff for CRA selection.
A: A is the blind spot, literally. A spectacle blind gives positive isolation from upstream flow, which makes B and D feel covered, and it blocks trim leakage paths that worry people during hot work, making C attractive. But once you trap liquid between closed boundaries, the blind does nothing to absorb thermal expansion, and pressure can rise to flange rating fast, especially offshore with sun exposure.
