Skip to main contentEngineering Courses, Mentoring & Jobs | EveryEng
Electrical System Design banner
Electrical System Design banner
Live Online Class Beginner

Electrical System Design

4(2)
1043 views
COMPLETED

Tell us and we’ll notify you when the next batch is scheduled.

40 hrs
Next month
English
1043 views
Subodh Sawant
Subodh SawantDesign Manager-Electrical Engineering (HOD)
  • Session recordings included
  • Foundational Learning
  • Access to Study Materials
  • Self-Paced Learning

Is this course for you?

You should take this if

  • You work in Oil & Gas Upstream or Energy & Utilities
  • You're a Electrical Engineering / Instrumentation Engineering professional
  • You prefer live, instructor-led training with Q&A

You should skip if

  • You need a different specialisation outside Electrical Engineering
  • You need fully self-paced, on-demand content

Course details

Electrical System Design

( Course Duration in Hours : 60 Hrs.)

 

1. Understanding Requirements

  • Load Analysis: Identifying the power requirements for different electrical loads (machinery, lighting, HVAC, etc.).

  • Site Survey: Assessing the physical location for installation constraints.

  • Regulatory Standards: Reviewing applicable codes, such as IEC, NEC, or local standards.

2. Preliminary Design

  • Single-Line Diagram (SLD): Developing a simplified representation of the electrical distribution network, showing how the main components (transformers, switchgear, etc.) are connected.

  • Load Calculation: Determining power consumption and sizing the electrical system components (transformers, switchgear, cables) based on demand.

  • Power Source Design: Deciding on the type of power source (utility grid, generators, renewable energy sources).

3. Component Selection

  • Cables and Wiring: Choosing appropriate conductor sizes based on current ratings and voltage drops.

  • Transformers: Selecting transformers based on load demand, voltage levels, and system configuration.

  • Switchgear & Protection Devices: Sizing circuit breakers, fuses, and relays for system protection.

  • Earthing/Grounding: Designing an effective earthing system to prevent electrical hazards.

4. System Protection Design

  • Short Circuit Analysis: Evaluating the potential fault current in the system and selecting devices to protect against overcurrent and short circuits.

  • Coordination Study: Ensuring that protection devices (relays, breakers) are coordinated for proper fault isolation without unnecessary downtime.

  • Arc Flash Study: Assessing potential arc flash hazards and designing the system to mitigate risks.

5. Lighting Design

  • Interior/Exterior Lighting: Designing lighting systems based on luminance requirements and energy efficiency standards.

  • Emergency Lighting: Integrating emergency and exit lighting for safety in case of power failure.

6. Distribution System Design

  • Cable Routing: Planning cable trays, conduits, and routing paths for minimal interference.

  • Busbar Design: For high-power systems, busbar sizing and configuration need to be considered.

7. Control and Automation

  • Building Automation Systems (BAS): Integrating controls for lighting, HVAC, and security systems.

  • Supervisory Control and Data Acquisition (SCADA): Designing SCADA systems for monitoring and controlling electrical equipment.

8. Energy Efficiency & Sustainability

  • Energy Auditing: Incorporating energy-saving strategies and selecting energy-efficient equipment.

  • Renewable Integration: Designing systems for solar, wind, or other renewable sources where applicable.

9. Documentation and Approvals

  • Detailed Drawings: Creating final circuit diagrams, layouts, and equipment details.

  • Bill of Materials (BOM): Listing all components required for installation.

  • Compliance Review: Ensuring the design meets regulatory requirements and securing necessary permits.

10. Installation and Commissioning

  • Installation Supervision: Overseeing the installation process to ensure it matches the design.

  • Testing & Commissioning: Conducting tests to validate system performance, including insulation resistance, continuity checks, and functional testing of protection systems.

11. Operation & Maintenance Planning

  • Maintenance Strategy: Developing a preventive maintenance plan for the system.

  • As-Built Drawings: Updating design documents to reflect any changes made during construction for future reference.

Course suitable for

Key topics covered

1. Understanding Requirements

  • Load Analysis: Identifying the power requirements for different electrical loads (machinery, lighting, HVAC, etc.).

  • Site Survey: Assessing the physical location for installation constraints.

  • Regulatory Standards: Reviewing applicable codes, such as IEC, NEC, or local standards.

2. Preliminary Design

  • Single-Line Diagram (SLD): Developing a simplified representation of the electrical distribution network, showing how the main components (transformers, switchgear, etc.) are connected.

  • Load Calculation: Determining power consumption and sizing the electrical system components (transformers, switchgear, cables) based on demand.

  • Power Source Design: Deciding on the type of power source (utility grid, generators, renewable energy sources).

3. Component Selection

  • Cables and Wiring: Choosing appropriate conductor sizes based on current ratings and voltage drops.

  • Transformers: Selecting transformers based on load demand, voltage levels, and system configuration.

  • Switchgear & Protection Devices: Sizing circuit breakers, fuses, and relays for system protection.

  • Earthing/Grounding: Designing an effective earthing system to prevent electrical hazards.

4. System Protection Design

  • Short Circuit Analysis: Evaluating the potential fault current in the system and selecting devices to protect against overcurrent and short circuits.

  • Coordination Study: Ensuring that protection devices (relays, breakers) are coordinated for proper fault isolation without unnecessary downtime.

  • Arc Flash Study: Assessing potential arc flash hazards and designing the system to mitigate risks.

5. Lighting Design

  • Interior/Exterior Lighting: Designing lighting systems based on luminance requirements and energy efficiency standards.

  • Emergency Lighting: Integrating emergency and exit lighting for safety in case of power failure.

6. Distribution System Design

  • Cable Routing: Planning cable trays, conduits, and routing paths for minimal interference.

  • Busbar Design: For high-power systems, busbar sizing and configuration need to be considered.

7. Control and Automation

  • Building Automation Systems (BAS): Integrating controls for lighting, HVAC, and security systems.

  • Supervisory Control and Data Acquisition (SCADA): Designing SCADA systems for monitoring and controlling electrical equipment.

8. Energy Efficiency & Sustainability

  • Energy Auditing: Incorporating energy-saving strategies and selecting energy-efficient equipment.

  • Renewable Integration: Designing systems for solar, wind, or other renewable sources where applicable.

9. Documentation and Approvals

  • Detailed Drawings: Creating final circuit diagrams, layouts, and equipment details.

  • Bill of Materials (BOM): Listing all components required for installation.

  • Compliance Review: Ensuring the design meets regulatory requirements and securing necessary permits.

10. Installation and Commissioning

  • Installation Supervision: Overseeing the installation process to ensure it matches the design.

  • Testing & Commissioning: Conducting tests to validate system performance, including insulation resistance, continuity checks, and functional testing of protection systems.

11. Operation & Maintenance Planning

  • Maintenance Strategy: Developing a preventive maintenance plan for the system.

  • As-Built Drawings: Updating design documents to reflect any changes made during construction for future reference.

Opportunities that await you!

Career opportunities

Training details

This is a live course that has a scheduled start date.

Why people choose EveryEng

Industry-aligned courses, expert training, hands-on learning, recognized certifications, and job opportunities-all in a flexible and supportive environment.

COMPLETED

Coming in Next Month

Questions and Answers

A: That's the most common mistake — assuming one document is authoritative without field confirmation. In brownfields, feeder tags drift over time, and the only way to avoid energizing the wrong circuit is a physical trace or live bucket check tied back to the MCC lineup.

A: That's the most common mistake — jumping straight to exotic mechanisms. In open-air coastal service, chloride-laden moisture plus oxygen drives general loss of section, which is why HDG thickness and coating quality matter more than alloy selection.

A: That's the most common mistake — letting starting conditions bleed into a steady-state check. Order-of-magnitude math using I·R over a few hundred meters lands you in the low single digits, which is why designers worry more about starts than run voltage here.

A: That's the most common mistake — treating Ex d like a sealing problem instead of an explosion containment one. The cable itself becomes a leak path for flame unless it's properly sealed, which is why certified barrier glands exist.