Skip to main contentEngineering Courses, Mentoring & Jobs | EveryEng
Mastering Battery Energy Storage Systems (BESS) banner

Mastering Battery Energy Storage Systems (BESS)

Mastering Battery Energy Storage Systems (BESS) banner
Live online Advanced

Mastering Battery Energy Storage Systems (BESS)

281 views
₹ 20000
35 hrs
Next month
English
Dr Bhawani Singh Rathore
Dr Bhawani Singh RathoreRenewable Energy Coach and Consultant
  • 7-day money-back guarantee
  • Session recordings included
  • Certificate of completion
Volume pricing for groups of 5+

Why enroll

1. To gain complete practical understanding of BESS industry.

2. To learn BESS design, costing and tendering skills.

3. To upgrade career opportunities in the fast-growing energy storage sector.

4. To learn directly from industry expert Dr. Bhawani Singh Rathore.

Is this course for you?

You should take this if

  • You work in Energy & Utilities or Renewable & New Energy
  • You're a Environment & Sustainability (ESG) / Mechanical professional
  • You have 3+ years of hands-on experience in this field
  • You prefer live, instructor-led training with Q&A

You should skip if

  • You're new to this field with no prior experience
  • You need a different specialisation outside Environment & Sustainability (ESG)
  • You need fully self-paced, on-demand content

Course details

1. This is a structured advanced training program on Battery Energy Storage Systems (BESS).

2. Designed for engineers, EPC professionals, consultants and energy sector aspirants.

3. Covers BESS from fundamentals to advanced engineering and project implementation.

4. Participants will understand complete BESS architecture including cells, modules, packs, racks and containers.

5. Practical design approach using Excel and professional software like Storlytics will be explained.

6. Real tender document analysis and costing methodology will be taught.

7. Financial modelling of BESS with solar projects will also be covered.

8. Course includes safety standards, regulations and quality requirements of BESS projects.

9. Vendor ecosystem, sourcing and manufacturing insights will be shared.

10. Installation, commissioning and O&M of BESS plants will be explained from real industry experience.

Course suitable for

Key topics covered

  • BESS Concept & Terminology

  • BESS Component Details

  • BESS Use Cases

  • BESS Safety & Quality

  • BESS Design – Excel & Storlytics

  • BESS Tender Document Review

  • Tender Costing

  • BESS + Solar Financial Modeling

  • BESS Revenue Streams

  • BESS Regulations & Standards

  • BESS Sourcing & Vendor Development

  • BESS Manufacturing & Assembly

  • BESS Installation & Commissioning

  • BESS Operation & Maintenance

Opportunities that await you!

Career opportunities

Training details

This is a live course that has a scheduled start date.

₹20000

₹0 Early bird

Coming in Next Month

Questions and Answers

Q: You're asked to sanity-check a container rating during an outage call. The PM forwards you the phrase engineers keep searching: how long will a 100 MW / 200 MWh BESS discharge at rated power with inverter losses. The vendor claims 2 hours flat. You have no SCADA, just nameplate data and typical efficiencies. What’s the defensible answer you give operations?

A: The hard boundary is the 200 MWh DC block versus 100 MW AC export. At 96% inverter efficiency, usable AC energy is ~192 MWh. Divide by 100 MW and you’re at 1.92 hours, then subtract fixed auxiliaries like HVAC and controls that keep drawing even at constant output. That pulls you just under 1.8 hours. The trap is assuming the MWh rating already lives on the AC side or that losses vanish at steady state.