Soil is the one material on a project that the designer does not choose, manufacture or control. It can only be investigated. Soil testing tells engineers how the ground will behave under load, which drives foundation type, depth, cost and risk. This article follows soil testing from the planning decision to the last day of construction.

Why Soil Testing Matters

  • Determines the bearing capacity (load the ground can safely carry)

  • Predicts settlement (how how fast the structure will sink)

  • Identifies groundwater, weak layers, expansive clay, fill or liquefiable sand

  • Guides excavation, shoring, dewatering and earthwork methods

  • Prevents cracks, tilting and costly redesign or failure

Unexpected ground conditions are among the most common causes of cost and schedule overruns so testing is an early investment, not an optional expense.

Stage 1: Planning the Investigation (Feasibility Stage)

  • Desk study

  • Before any drilling the team reviews existing information:

  • Geological and soil maps

  • Previous investigation reports from sites

  • Aerial photos and site history (old landfill, river channel, industrial use, demolished structures)

  • Flood, seismic and groundwater records

Site reconnaissance

A geotechnical engineer walks the site to observe topography, drainage, vegetation, nearby structures, existing cracks and access for drilling rigs.

Investigation scope

The scope is set based on project type, size and loads:

  • Number and spacing of boreholes ( one per 200 to 400 sq m for buildings or per code requirement)

  • Depth of exploration ( 1.5 to 2 times the footing width below foundation level or deeper to firm strata for piles and tall structures)

  • Types of in-situ and laboratory tests required

Stage 2: Field Investigation (Pre-Design)

Exploration methods

Test pits / trial pits: Shallow inspection of soil layers and groundwater for light structures

Auger boring : Quick shallow sampling in soft to medium soils

Rotary / wash boring: Deep boreholes through soil and soft rock

Core drilling :Rock sampling for rock-socketed foundations

surveys :Non-invasive mapping of layers, voids or bedrock depth

In-situ (field) tests

Standard Penetration Test (SPT): a split-spoon sampler is driven into the borehole and the number of blows for 300 mm penetration (N-value) indicates soil density or stiffness. The common test worldwide.

Cone Penetration Test (CPT): a cone is pushed into the ground giving a profile of resistance. Fast and detailed in soils.

Plate Load Test: a steel plate is loaded at foundation level to measure bearing capacity and settlement directly.

Vane Shear Test: measures shear strength of soft clays.

Pressuremeter / Dilatometer tests: measure soil stiffness and strength in place.

Field density tests (sand replacement, core cutter): check in-place density during compaction control.

Groundwater observation: water levels are recorded during drilling. Monitored afterward through standpipes or piezometers.

Sampling

samples: for classification tests (grain size, plasticity).

Undisturbed samples: walled tubes (Shelby tubes) or block samples for strength and consolidation tests.

Rock cores: assessed for recovery and quality (RQD).

Water samples: for analysis.

Stage 3: Laboratory Testing

Samples are labeled, sealed and transported carefully to the laboratory.

Classification and index tests

  • Moisture content

  • Sieve. Hydrometer analysis (particle size)

  • Atterberg limits ( limit, plastic limit, plasticity index)

  • Specific gravity

  • Bulk and dry density

Strength tests

  • Unconfined compression test

  • Direct shear test

  • Triaxial test (UU, CU, CD) the informative for shear strength parameters

Compressibility tests

  • Consolidation (oedometer) test, used to estimate the magnitude and rate of settlement

Other tests

  • Swelling and shrinkage tests for expansive clays

  • Permeability tests

  • Rock tests: uniaxial compressive strength, point load index

  • Chemical tests: pH, sulfates and chlorides in soil and groundwater to select cement type and protect concrete and steel from attack

Stage 4: Geotechnical Report and Design Input

The consultant compiles the findings into a geotechnical investigation report normally including:

  • Borehole logs and soil profile

  • Groundwater level

  • Test results and interpretation

  • Recommended foundation type and depth

  • Safe bearing capacity and expected settlement

  • Seismic parameters and liquefaction potential

  • Recommendations for excavation dewatering, retaining structures and earthwork

  • Chemical aggressiveness and cement recommendations

  • Construction cautions and risks

The structural and architectural teams then use this report to choose between isolated footings, raft, piles or other options and to plan basements retaining walls and site grading. If the report reveals ground the design may be changed the site layout adjusted or ground improvement planned.

Stage 5: Pre-Construction (Tender and Planning)

  • The geotechnical report is included in documents so contractors price the ground risk consistently.

  • Additional investigation is carried out if the foundation layout changes, if gaps appear or if boreholes were widely spaced.

  • Method statements for excavation, shoring, dewatering and piling are prepared based on the soil data.

  • Test pile programs and ground improvement trials are planned.

Stage 6: Testing During Construction

Soil work continues on site. This is where the investigation is verified.

Excavation stage

  • Inspect the exposed ground at foundation level. Compare it against the report.

  • Confirm the bearing stratum with an engineer or a field test (for example plate load or dynamic cone test).

  • Check groundwater inflow and slope or shoring stability.

Backfill

  • Test fill material before use (grading, plasticity, Proctor compaction).

  • Standard or Modified Proctor Test: establishes dry density and optimum moisture content.

  • Field density tests: verify compaction achieved at least 95 to 98 percent of laboratory maximum density per specification.

  • Check layer thickness, moisture and roller passes.

  • Ground improvement verification (if used)

  • Compaction, preloading, stone columns, soil nailing or grouting are tested to confirm the target strength and settlement improvement.

Pile foundations

  • Initial (test) pile load tests to verify the design capacity before production piling.

  • Routine load tests on working piles.

  • Pile integrity tests ( strain) to detect cracks necking or defects.

  • Records of concrete volume and reinforcement for each pile.

Instrumentation and monitoring

On sensitive projects, settlement points, inclinometers, piezometers and crack gauges track the response of the ground and nearby structures throughout excavation and loading.

Stage 7: Post-Construction

  • Settlement monitoring continues for a period as the building takes load and results are compared with predictions.

  • Final as-built records of foundations test results and monitoring data are handed over to the client.

  • Any deviations, from the report are documented for future modification, extension or maintenance work.

  • Lessons learned are fed back into investigations.

Opportunities that await you!

Career opportunities

Why people choose EveryEng

Industry-aligned articles, expert knowledge, hands-on learning, and career-relevant topics—all in a flexible and supportive environment.

Free to read

Join EveryEng to save articles and keep learning