Skip to main contentEngineering Courses, Mentoring & Jobs | EveryEng
Pilot Plant and Scale-up Studies banner
Live Online Class Beginner

Pilot Plant and Scale-up Studies

4(14)
229 views
Trainers Rating
4(14)
Course type
Instructor led live training
Duration
18 hrs
Start
Next month
Language
English
Views
229
  • 7-day money-back guarantee
  • Session recordings included
  • Foundational Learning
  • Access to Study Materials
$ 150
Enggenious (SAN Techno Mentors)
Enggenious (SAN Techno Mentors)

Why enroll

  • How to carry out successful process translations from the laboratory to the pilot plant project.

  • How to operate pilot plants. Scale-up criteria for several unit processes.

  • How to use the data from pilot plants for the design of commercial plants.

Course details

This course is designed to provide basic concepts and practical advice on how to perform laboratory and pilot plant studies and scale-up toward commercial plant for process translation of many unit processes in the field of chemical industries. The course will provide strategies for approaching a pilot plant study, improving and justifying a pilot plant study, and process scaling. Emphasis throughout the course will be on many fluid, mass, heat, and simultaneous mass and heat unit processes. This includes mixers, heat exchangers, absorbers, evaporators, dryers, reactors and bioreactors and other unit processes.

Course suitable for

Is this course for you?

Perfect for

  • You work in Oil & Gas Upstream or Pharmaceutical & Healthcare
  • You're a Chemical & Process / Instrumentation Engineering professional
  • You want to build skills in Control Systems, Project Management
  • You prefer live, instructor-led training with Q&A

Before you enrol

  • No prior experience needed for this course
  • Live online sessions — join on the scheduled dates

Key topics covered

1-Pilot plant definition and design - General definitions - Project scope - Recent trends in pilot plant practice - Pilot plant design steps

2- Simultiude and Criteria for Scale-up - Similtude - Types of similarity - Scale-up definition - Criteria for scale-up - Scale-up by Dimensional similitude - Scale-up by mathematical modelling - Scale-up by Dimensional similitude

3- Mixing equipments scale-up - Mixers selection - Scale-up of liquid-liquid systems - Scale-up of solid-liquid systems

4.- Scaleup of solid-liquid filters - Filters selection - Scale-up methods for different filters

5- Scaleup of industrial evaporators - Evaporators selection - Scale-up of rotary thin film evaporators

6- Scaleup of Polymerization Reactors - Polymerization Reactors - Scale-up Considerations in polymerization Reactors

7- Scaleup of industrial dryers - Dryers selection - General scale-up of dryers - Scale-up of spray dryers

8- Scale-up of distillation columns - general introduction - Scale-up of plate columns

9- Scale-up of packed-bed columns

Training details

This is a live course that has a scheduled start date.

Opportunities that await you!

Career opportunities

Frequently asked questions

A: A: Matches the alarm that 'shouldn't be possible'. Redundancy exists only if both valves can move. Loss of air takes one out and halves capacity. B: Would bias level, but you'd see steady offset, not a sudden HH coincident with air issues. C: A cracked bypass drains level, it doesn't drive HH unless you're misreading trends. D: Internals affect carryover downstream, not vessel level climbing against control.

A: A: Handles wet chlorides better during idle periods when oxygen sneaks in. B: Linings hate thermal cycling and pilot plants cycle a lot; holidays become leaks. C: 304 takes chloride pitting early; temperature isn't the only driver. D: Overkill here and introduces chipping risk during frequent modifications.

A: A: 1.2 / 3.6 gives 0.333 h, that's 20 min. Straight definition. B: Vapor holdup changes effective volume only if reaction is in vapor; not stated. C: Safety factors don't change the reported residence time, only design margins. D: Unit handling error that pops up in reviews, but math doesn't hold.

A: A: Cold loop check catches wiring, logic, and valve action without adding risk. B: Heating comes later; you're skipping interlocks. C: Calibration happens before circulation unless process conditions are required. D: FAT doesn't cover field wiring or as-built terminations.

$150

Coming in Next Month

What learners say about this course

Industry-aligned courses, expert training, hands-on learning, recognized certifications, and job opportunities-all in a flexible and supportive environment.

Put no limit on your engineering passion.

We would love to hear from you.

Engineers collaborating around a laptop