Skip to main contentEngineering Courses, Mentoring & Jobs | EveryEng
Piping Codes and Standards used in Process Plants banner
Preview this course
Piping Codes and Standards used in Process Plants banner
Preview this course
Self-paced Beginner

Piping Codes and Standards used in Process Plants

4(409)
244 views
$ 20
78 min
Anytime
English
244 views
Anup Kumar Dey
Anup Kumar DeyOwner of https://whatispiping.com/
  • 7-day money-back guarantee
  • Lifetime access
  • Foundational Learning
  • Access to Study Materials

Why enroll

Participants should join this course on Piping Codes and Standards for these key reasons:

  • Career Advancement.

  • Clear understanding of the differences between codes, standards, and specifications.

  • To become aware of common piping codes and standards.

Is this course for you?

You should take this if

  • You work in Oil & Gas Downstream or Energy & Utilities
  • You're a Piping & Layout Engineering / Chemical & Process professional
  • You want to build skills in Engineering & Design
  • You prefer self-paced learning you can revisit

You should skip if

  • You need a different specialisation outside Piping & Layout Engineering
  • You need live interaction with an instructor

Course details

This course on Piping Codes and Standards equips engineers, designers, and piping professionals with a preliminary understanding of key piping codes and standards.  Participants will understand the importance and meaning of codes, standards, specifications and their differences. This course will also list the common piping codes and standards that are usually followed in a process plant design.

Course suitable for

Key topics covered

  • Meaning of Codes

  • Meaning of Standards

  • Meaning of Specifications

  • Differences between Codes, Standards, and Specifications

  • Different Piping Codes and Standards, ASME Codes and Standards, Common British and Indian Standards

  • Example Brief about ASME B31.3 Code

  • Various free bonus lectures of more than 1.5 hours duration to make your learning stronger.

Course content

The course is readily available, allowing learners to start and complete it at their own pace.

2 modules16 lectures1 hr 18 min
  1. Importance of Piping Codes and Standards
    14 min
  2. Meaning of Piping Codes, Standards, and Specifications
    15 min
  3. Piping Codes
    10 min
  4. Various ASME and API Standards
    11 min
  5. Various ASTM Standards
    3 min
  6. British and Indian Standards
    7 min
  7. Scope of a typical Piping Code ASME B31.3
    8 min
  8. References and Further Studies
    2 min
  1. Piping Codes and Standards
    1 min
  2. Piping Codes and Standards ( Process Piping)
    1 min
  3. Piping and Piping Engineering Codes and Standards
    1 min
  4. Codes & Standards, Recommended Practices used in Oil & Gas Piping I Pressure & Process Piping Codes
    1 min
  5. Codes & Standards Used In Piping Industry
    1 min
  6. Codes & Standrds for Piping
    1 min
  7. Webinar | ASME B31 I Piping systems for industrial plants
    1 min
  8. Little More about Piping Specifications
    1 min

Opportunities that await you!

Skills & tools you'll gain

Career opportunities

Why people choose EveryEng

Industry-aligned courses, expert training, hands-on learning, recognized certifications, and job opportunities-all in a flexible and supportive environment.

$20

Access anytime

Questions and Answers

A: The break point is the allowable stress table versus temperature. B31.3 sustained stress uses Sh at operating metal temperature; for SA-106 Gr B that value declines materially above ~200°C. Holding Sh constant masks overstress until a hot condition shows up in fitness-for-service.

A: The pressure-temperature curve is the limiter. At 120°C, B16.5 Class 150 carbon steel ratings fall well below 40 barg, independent of pipe schedule or gasket type.

A: The pressure term 2SE in B31.3 drives a thin-wall result around 5.6 mm, then you add 3 mm CA. Dropping CA or misplacing it into stress is the common miss.

A: The cue is the filled triangle against the line. Older P&IDs often used that for blinds rather than modern figure-eight symbols, and missing it leads to bad isolation planning during the turnaround.