Materials Management in Large Infra Projects & Plants

Materials Management in Large Infra Projects & Plants banner
Live online Beginner

Materials Management in Large Infra Projects & Plants

4(8)
1051 views
$ 30
3 hrs
Next month
English , Hindi
1051 views
Vijay Sachdev
Vijay SachdevConsultant - Project & Procurement
  • 7-day money-back guarantee
  • Session recordings included
  • Certificate of completion

Why enroll

Course will give insight into the complete process of Materials Management right from Receipt to Issue / Return & Reconciliation.

Storage Traceability, Preservation, Non-Conformity Control and Insurance will also be covered.

Course will be online interactive, where participants are free to ask any related question.

Is this course for you?

You should take this if

  • You work in Oil & Gas Upstream or Energy & Utilities
  • You're a Chemical & Process / Mechanical Engineering professional
  • You want to build skills in Lean Manufacturing, Preventive maintenance
  • You prefer live, instructor-led training with Q&A

You should skip if

  • You need a different specialisation outside Chemical & Process
  • You need fully self-paced, on-demand content

Course details

Materials Management is like a Heart for any Large Industry, Plant or Project. Its prime responsibility to ensure supply of required material in time so that Production or Progress is not stopped or interrupted.

As you cannot see your own Heart, same way Management also do not visualize the importance and contribution of their own team of Materials Management.

Objective of this training session is to share the practical experience, so that MM Professionals will be able to implement good practices of Materials Management to improve Profitability of the Organization.

Course suitable for

Key topics covered

During the Session, you will walkthrough complete process of Materials Management which will include:

(With Formats)

> Receipt, Inspection & Non-Conformity Control

> Material Identification & Traceability

> Dealing with Insurance during MM

> Storage & Preservation

> Stock keeping

> Issue Control

> Cannibalization & Reconciliation

Opportunities that await you!

Skills & tools you'll gain

Lean ManufacturingPreventive maintenance Project ManagementProcess ImprovementProject Planning

Career opportunities

Training details

This is a live course that has a scheduled start date.

Why people choose EveryEng

Industry-aligned courses, expert training, hands-on learning, recognized certifications, and job opportunities-all in a flexible and supportive environment.

$30

$40

Coming in Next Month

Questions and Answers

A: Underestimating here drives late steel orders and offshore hot work, both schedule killers. A quick chain: 1.2 kN/m over 60 m gives 72 kN pipe load. Typical racks land around 2.5–3.5× sustained load when you include beams, columns, bracing, and corrosion allowance. That converts to roughly 180–250 kN of steel, or about 18–25 tonnes. That range flags whether the subcontractor is off by a factor, without pretending it's a detailed take-off.

A: Oversized hydrotest sections can overstress temporary blinds and hoses, leading to leaks or uncontrolled releases. Valves normally provide natural test breaks. Without them, test limits extend, volumes climb, and stored energy rises fast. The correct concern links materials sequencing to test safety and equipment limits, not secondary fabrication effects.

A: Cutting the wrong alloy locks in rework and scrap that can't be reversed offshore. Matching heat numbers anchors paper to metal, then targeted PMI confirms chemistry before value is added. That order blocks both counterfeit certs and mixed stock without exploding the schedule.

A: Underestimating lift weight risks crane overload and dropped objects, a hard stop offshore. Class 600 bodies scale with wall thickness and bonnet mass, not just bore. Typical 12-inch Class 600 gates land close to 2 tonnes each. Planning in the 20-tonne range keeps lift studies and deck loading realistic without gold-plating.