Skip to main contentEngineering Courses, Mentoring & Jobs | EveryEng
Piping Layout Engineering_December 2024 Batch banner
Piping Layout Engineering_December 2024 Batch banner
Live Online Class Basic

Piping Layout Engineering_December 2024 Batch

4(63)
1 enrolled
1493 views
Trainers Rating
4(63)
Course type
Instructor led live training
Duration
30 hrs
Start
Dec 14, 2024 · 2:30 PM
Language
English
Views
1493
  • 7-day money-back guarantee
  • Session recordings included
COMPLETED

Dec 14, 2024

Tell us and we’ll notify you when the next batch is scheduled.

Team Piping Engineering
Team Piping EngineeringFounder Team Piping Engineering

Is this course for you?

Perfect for

  • You work in Oil & Gas Upstream or Chemical
  • You're a Piping & Layout Engineering / Mechanical Engineering professional
  • You prefer live, instructor-led training with Q&A

Before you enrol

  • No prior experience needed for this course
  • Live online sessions, 1 hour per day over 30 days — join on the scheduled dates

Key topics covered

  1. Introduction to Piping Layout Engineering:

    • Overview of Piping and Instrumentation Diagrams (P&ID)

    • Importance of accurate piping layouts in industrial projects

  2. Converting P&ID into Piping Layouts:

    • Step-by-step methodology for converting P&ID into detailed piping layouts

    • Common challenges and solutions in the conversion process

  3. Understanding Process Equipment:

    • Types of process equipment and their functions

    • Installation requirements and piping connections for process equipment

    • Case studies and real-world examples

  4. Understanding Utility Equipment:

    • Types of utility equipment (e.g., boilers, compressors, pumps)

    • Installation requirements and piping connections for utility equipment

    • Best practices for integrating utility equipment into overall piping layouts

  5. Plot Plan Development:

    • Principles of plot plan development

    • Standards and statutory requirements for plot plans

    • Layout of various units within an industrial plant

    • Case studies of successful plot plans

  6. Pipe Rack Design:

    • Importance and function of pipe racks in industrial plants

    • Designing pipe racks: considerations for placing lines, width, and height calculations

    • Development of pipe rack layouts

    • Preparation of isometric drawings for pipe racks

    • Hands-on exercises and practical examples

  7. Storage Terminal / Tank Farm Design:

    • Overview of storage terminals and tank farms

    • Designing storage terminals: equipment layout, piping layout, and support design

    • Nozzle orientation and its impact on piping design

    • Construction isometrics for storage terminals

    • Differences between greenfield and brownfield projects

    • Real-world examples and design exercises

  8. Standards and Codes in Piping Layout Engineering:

    • Overview of relevant standards and codes (e.g., ASME, ASTM)

    • Ensuring compliance with industry standards

    • Case studies of projects adhering to standards

Training details

This is a live course that has a scheduled start date.

Live session

Started

Sat, Dec 14, 2024 Ended

2:30 PM UTC· your timezone

Duration

1 hour per day

30 days total

Opportunities that await you!

Career opportunities

Frequently asked questions

A: A: Velocity drops, but the valve is still inside the disturbed zone off the nozzle. API language targets flow profile, not just speed. B: This restores velocity profile and swirl decay. Stress is a separate check, but hydraulics come first here. C: Orientation doesn't change the hydraulic entrance effects the valve sees. D: Operational workaround, not a layout fix, and it creates a controllability risk.

A: A: Issue date doesn't trump physical geometry. The nozzle elevation drives real liquid height. B: This checks the alarm against vessel limits using what steel exists, not what paper says. C: Night shift convenience move. Leaves you blind if it's real. D: Changing setpoints without reconciling elevation can push liquid into internals.

A: A: Automatic update isn't how contracts work, even for safety. B: Contract reference controls unless amended. Deviations need paper. C: Vendor compliance doesn't override EPC obligations. D: You don't split standards ad hoc; that's how gaps appear.

A: A: Higher level pushes liquid closer to the gas outlet, worsening carryover. B: Inlet devices have turndown limits; poor momentum breakup shows up at low rates. C: Less density means worse droplet capture when velocity is already low. D: Backpressure changes separator balance and can flood internals.

COMPLETED

Dec 14, 2024 · 2:30 PM

What learners say about this course

Industry-aligned courses, expert training, hands-on learning, recognized certifications, and job opportunities-all in a flexible and supportive environment.

Put no limit on your engineering passion.

We would love to hear from you.

Engineers collaborating around a laptop