Skip to main contentEngineering Courses, Mentoring & Jobs | EveryEng
Process Design Engineering_September 2024 Batch banner
Process Design Engineering_September 2024 Batch banner
Live Online Class Basic

Process Design Engineering_September 2024 Batch

4(400)
2 enrolled
3720 views
COMPLETED

Tell us and we’ll notify you when the next batch is scheduled.

45 hrs
Sep 7, 2024 · 2:30 PM
3720 views
Process Engineering World
Process Engineering World
  • 7-day money-back guarantee
  • Session recordings included

Is this course for you?

You should take this if

  • You work in Oil & Gas Upstream or Pharmaceutical & Healthcare
  • You're a Chemical & Process professional
  • You prefer live, instructor-led training with Q&A

You should skip if

  • You need a different specialisation outside Chemical & Process
  • You need fully self-paced, on-demand content

Course details

Course suitable for

Key topics covered

1. Introduction to Process Engineering

2. General Points in Process Engineering

3. Heat Exchangers

4. Vessels - Agitated

5. Compressors

6. Fans & Blowers

7. Pumps

8. Utility Equipments and design

9. Line sizing - Liquid, Vapor & Gas

10. Dryers

11. Pressure Safety Valve, Rupture disc working & its sizing

12. Breather valve and it's sizing

13. Vacuum generating equipments

14. Flame Arrestors

15. Instrumentation selection and sizing

16. Filtration

17. Valves - Manual & Control

18. Crystallization

19. Different types of Industrial projects handled by process engineer

20. Process engineering deliverables

21. P&IDs, PFD, ULD, GAD, Layout reading

22. Different types of safety studies in project

23. Automation & Control philosophy

24. MOC selection

Weekly 3 lectures

Opportunities that await you!

Career opportunities

Training details

This is a live course that has a scheduled start date.

Live session

Started

Sat, Sep 7, 2024 Ended

2:30 PM UTC· your timezone

Duration

1 hour per day

45 days total

Why people choose EveryEng

Industry-aligned courses, expert training, hands-on learning, recognized certifications, and job opportunities-all in a flexible and supportive environment.

COMPLETED

Sep 7, 2024 · 2:30 PM

Questions and Answers

A: Option A would let operations credit isolation that isn't demonstrable during audit, creating a COMAH non-conformance. Option B assumes as-built status without evidence, which fails under inspection when tag reconciliation is requested. Option C misreads function and ignores bleed sizing and positive isolation criteria. Option D recognises intent versus evidence and forces verification before claiming DBB in a safety case.

A: Option A would drive severe liquid carryover because droplet settling doesn’t scale that way at field densities. Option B imports flare KO logic and ignores continuous separation duty. Option C overshoots volume badly and signals a slugging assumption that isn’t stated. Option D aligns with common production separator practice without inflating vessel size.

A: Option A would explain control issues but not sustained carryover with stable feed. Option B raises entrainment risk but usually shows as pressure drop changes and noise. Option C fits carryover yet typically shows rising level and chemical history flags. Option D links unstable level signal with gas ingestion and downstream liquid slip.

A: Option A underestimates by three orders due to phase error. Option B keeps volumetric units and breaks API 521 methodology. Option C drops the actual continuous flow assumption inherent in blocked outlet. Option D correctly converts 100 m3/h by density to mass flow at relief conditions.